Tuesday 20 December 2016

Procedure for Log book preparation.

1.0
PURPOSE
To lay down a procedure for the preparation of log book for equipment.

2.0
SCOPE
This procedure is applicable to the all equipment situated in Compny name.
3.0
RESPONSIBILITY
Officer  Production /Officer QA
4.0
ACCOUNTABILITY
Head Production/Head QA
5.0
PROCEDURE

5.1

5.2

5.3

5.4
















5.5

5. 6










5.7

5.8


All the equipment must have an individual log book. .

All the activity done on equipment shall be recorded in log book.

The log book contain operational, cleaning & Brea down/ maintenance record.

The log book for any equipment shall be contain the following parameters:
      a) Equipment Name
      b) Equipment Identification Number.
      c) Department
      d) Location
      e) Date      
      f) Name of the product
      g) Batch Number
      h) Mfg. date
      i) Exp.date
      j) B.Size
      k) Operational activity (Procedure time)
      l) Done by.
     m)Checked By
     n) Verified By
     o) Remarks

The log shall be prepared in a register form as per the Annexure-I.

 Any break down in equipment must be recorded.

The log book for break down contain the fallowing parameter-

a) Date
b)Details of break down
c)Corrective action taken
d) Rectified by
e) Checked by
f) Remarks

The log book shall be in a register form as per annexure II.

Maintain the records of all equipment as per log book.


6.0
REFERENCES     
SOP guideline by  D.H. Shah                                                                                                                                   


7.0
ANNEXURES

Annexure No.
Title of Annexure
Format No.
Annexure I
EQUIPMENT LOG BOOK
QA/039/F01-02
Annexure II
BREAK DOWN LOG BOOK
QA/039/F02-00


8.0
ABBREVIATIONS
Abbreviations
Full Forms
SOP
Standard Operating Procedure
QA
Quality Assurance
9.0
DISTRIBUTION
Master Copy
Head Quality Assurance Department

Controlled office Copy No. 1
Head Quality Assurance Deptt.

Controlled office Copy No. 3
Head Production (Tablet) Deptt.

Controlled office Copy No. 4
Head Production (Liquid) Deptt

Controlled office Copy No. 5
Head Production (External) Deptt

Controlled office Copy No. 6
Head Production (Soap) Deptt

Controlled office Copy No. 8
Head Store  Dept.(Main Block)

Controlled office Copy No. 10
Head Engineering Dept.

Controlled office Copy No. 11
Head Store  Dept.(External Block)

10.0
REVISION HISTORY
S.No.
Revision No.
Effective Date
Reason for Revision
Details of Change
Authorized By
(sign & Date)












                                                               
Annexure II
BREK DOWN RECORD

Date
Datails of Break down
Corrective action taken
Rectified by (Eng.)
Checked
By (Prod.)
Remark



























Annexure I
EQUIPMENT LOG BOOK
 EQUIPMENT NAME:
EQUIPMENT ID NO.:
DEPARTMENT:
LOCATION:
OPERATION RECORD
CLEANING RECORD
Date
Product Name
Batch No
Mfg Date
Exp.
Date
Batch Size
Start time
Completion Time
Operator
Checked By
Cleaning done
Cleaned by
Checked By
Verified By IPQA
Remark
From
To


































3 comments:

  1. Thank you for writing this quality informational content. Your writing technique is impressive and enjoyable to read. If you want about Development services company.

    ReplyDelete
  2. I appreciate how SOP Writers in Banglore adeptly weave together experiences and aspirations, creating narratives that resonate deeply with readers.

    ReplyDelete

Tablet coating and their related questions

Tablet coating and their related questions: What is Tablet coating ?   Tablet coating  is one of the oldest pharmaceutical pro...