Tuesday 20 December 2016

Procedure for preventive maintenance of all Instruments

1.0
PURPOSE
To lay down a procedure for the preventive maintenance of all instruments.
2.0
SCOPE
This procedure is applicable to the preventive maintenance of all instruments.
3.0
RESPONSIBILITY
Instrument operator
4.0
ACCOUNTABILITY
Head of Concern departments.

5.0
PROCEDURE.

5.1

5.2

5.3

5.4

5.5

5.6

5.7

5.8


The preventive maintenance of all instruments should be performed and recorded as per Annexure I.

Switch off the instrument from main incoming power supply.

Remove the cover and guard of the instruments.

Switch on the instruments from main incoming power supply and check all parameter’s of operation.

After completion of the maintenance fit all cover and guard of the instrument

Check all connection, it shall be properly connected..

The Preventive maintenance of all instrument should be performed as of any breakdown occurred.

The record of breakdown should be maintain along with the instrument record as per annexure I.

6.0
REFERENCES     
Nil


7.0
ANNEXURES

Annexure No.
Title of Annexure
Format No.
Annexure I
 INSTRUMENT HISTORY LOG
QA/040/F01-02

8.0
ABBREVIATIONS
Abbreviations
Full Forms
SOP
Standard Operating Procedure

9.0

DISTRIBUTION

Master Copy
Head Quality Assurance Department

Controlled office Copy No. 1
Head Quality Assurance Deptt.

Controlled office Copy No. 2
Head Quality Control Deptt.

10.0

REVISION HISTORY
S.No.
Revision No.
Effective Date
Reason for Revision
Details of Change
Authorized By
(sign & Date)












Annexure I
 INSTRUMENT HISTORY LOG
INSTRUMENT NAME  :                                                                                                                                                                 MAKE   :                                   

INSTRUMENT ID No.   :                                                                                                                                                                  MODAL :

S.No.
Date
Details OF Break Down
Probable reason of Breakdown
Corrective Action Taken
Rectified By
(Eng.)
Checked By (Concern Deptt head)
Calibration Required
Calibration Done By/Data






















2 comments:

  1. The SOP Writers in Banglore excel in delivering documents that not only meet but surpass the standards, showcasing their commitment to excellence.

    ReplyDelete

Tablet coating and their related questions

Tablet coating and their related questions: What is Tablet coating ?   Tablet coating  is one of the oldest pharmaceutical pro...