Tuesday, 13 December 2016

Procedure for conducting terminal inspection on finished pack

1.0
PURPOSE
To lay down procedure for carry out Terminal Inspection on finished packed product this is ready to transfer to finished goods store.

2.0
SCOPE
This Standard Operating Procedure is applicable to inspect each and every product/batch terminally.
3.0
RESPONSIBILITY
IPQA Chemist

4.0
ACCOUNTABILITY
Head QA
5.0
PROCEDURE

5.1

5.2


5.3

5.4

5.5

5.6


5.7


5.8

5.9


5.10



5.10



Check for the product particulars to be inspected as per the details given by the packing supervisor.

Check the Batch Processing Record thoroughly for the complete required entries in the relevant columns duly signed and dated by the designated person.

Randomly select at least the 10 % of the total number of finished pack.

Open the above selected finished pack one by one and check the following parameters and record:-

Integrity and Physical appearance of the Pack.

Corrugated box label, legibility and correctness of coding details on it and in subsequent packing materials wherever coding is there.

Correctness of Quantity/Number of units and sub-units in the corrugated box (Finished Pack) and subsequent inner packing.

Correctness of labeling and packing style.

Leakage, any tear, breakage or damage of product or of any packing material which warrants and exhibits quality not conforming to the set standards etc.

Record the defects observed on the above parameters on the Terminal Inspection Report form, and if the defects warrants threat to the visual and intrinsic quality of the product then put the batch under hold and inform packing supervisor and Incharge Production for the corrective actions.

Verify the corrective action taken by checking 10 % of the reworked finished pack and prepare the report. Sign the transfer ticket if the batch is released on the basis of above observations.       

6.0
REFERENCES     
NIL

7.0
ANNEXURES

Annexure No.
Title of Annexure
Format No.
Annexure I
TERMINAL INSPECTION REPORT

QA/020/F01-03

8.0
ABBREVIATIONS
Abbreviations
Full Forms
SOP
Standard Operating Procedure
QA
Quality Assurance
9.0
DISTRIBUTION
Master Copy
Head Quality Assurance Department

Controlled office Copy No. 1
Head Quality Assurance Deptt.





10.0




REVISION HISTORY
S.No.
Revision No.
Effective Date
Reason for Revision
Details of Change
Authorized By
(sign & Date)

















                                               


Annexure I
TERMINAL INSPECTION REPORT
Product Name


Batch No.

Mfg. Date


Exp. Date

Total No. of Corrugated Boxes Packed

Pack Size



Total Boxes taken for inspection



Nature of Defects Observed

No. of Defective Units Observed
















Total Defective units observed


% Defective of finish good.



Remarks: Above batch is released /not release to transfer Finished Goods Store.

IPQA Chemist

Signature & Date


3 comments:

  1. ALL SOP's WEALTH IT THANKS SO MUCH FOR SUCH MATERIALS AND WELL UPDATED

    ReplyDelete
  2. Excellent and very exciting site. Love to watch. Keep Rocking. Dilapidation reports

    ReplyDelete

Tablet coating and their related questions

Tablet coating and their related questions: What is Tablet coating ?   Tablet coating  is one of the oldest pharmaceutical pro...